1. <tt id="5hhch"><source id="5hhch"></source></tt>
    1. <xmp id="5hhch"></xmp>

  2. <xmp id="5hhch"><rt id="5hhch"></rt></xmp>

    <rp id="5hhch"></rp>
        <dfn id="5hhch"></dfn>

      1. 電氣工程師個人英文簡歷

        時間:2024-08-15 10:01:00 英文簡歷 我要投稿
        • 相關推薦

        電氣工程師個人英文簡歷

          Name: Mr. Yang sex: Male

        電氣工程師個人英文簡歷

          Marital status: single people: Dong

          Household registration: Guizhou - Kaili age: 26

          Current location: Guangdong - Shenzhen high: 165cm

          Hope area: Guangdong - Shenzhen

          Hope position: electronic / electrical / components - Electrical Engineer / Technician

          Automatic control technology of electronic / electrical / element class

          Mechanical (Electrical) / Instrument - electromechanical integration

          Find jobs: mechanical hand application engineer, electrical engineer, PLC Engineer

          Education experience

          2008-09 ~ 2010-10 Guizhou electronic information of Career Technical College College of electromechanical integration

          Training experience

          2012-11 ~ 2012-12 Guangzhou Shougang Yasukawa robot Co., Yasukawa robot primary application Yasukawa robot Junior Certificate

          2010-03 ~ CAD and UG 2010-07 China employment training technical guidance center of 3D modeling of 3D digital modeling Division

          2009-05 ~ 2009-12 Chinese employment training technical guidance center of programmable logic controller (PLC) application of PLC programmers

          * * company (2011-12 ~ 2012-11)

          Company nature: joint-stock enterprise category: instrumentation, electrical equipment, industrial automation

          Position: electrical engineer job category: Electrical Engineer / Technician

          Job description: mainly is the production of non-standard automation equipment: and sales to service site to study, understand the customer on-site production process, what kind of function of the equipment, back to make a let the customer the most satisfactory solution, can communicate with customer communication needs in what place to do some modifications. After the selection and cost price of products, convenient salesman to bid. After winning the bid to make detailed control system of the whole set of equipment, the design of control circuit, write control program, make the control interface debugging, technical guidance, customer service. The main use of equipment: EPSON manipulator, Yaskawa manipulator, industrial vision, PLC, servo drive, Bu Jin drive, touch screen waiting......

          Reason for leaving: contract expires

          * * company (2010-10 ~ 2011-12)

          Company nature: joint venture enterprise category: instrumentation, electrical equipment, industrial automation

          Position: repair engineer job category: Electrical Engineer / Technician

          Job description: mainly engaged in design, device control circuit of PLC programming and debugging, fault repair of electrical equipment, installation and commissioning of the equipment on site, anyway, is a service in a small company of a dragon.

          Reason for leaving: want to change for a better platform

          Project experience

          Injection molding machine automation robot (2012-09 ~ 2012-11)

          Job title: Electrical Engineer

          Project Description: the working environment is bad, to replace the manual manipulator. With two mechanical hand, a small 4 axis, shake out with vibrating tray products, 4 axis manipulator automatically to clip onto the tray in place. Mechanical hand used for large put the tray to go inside the injection molding machine injection. Injection well after the empty tray back

          Responsibility description: design non-standard automation equipment control system, combined with mechanical engineer to design some mechanism and modeling, selection of electrical components, mechanical hand written program debugging, now

          Automatic locking screw manipulator (2012-06 ~ 2012-10)

          Job title: Electrical Engineer

          Project Description: the manipulator is installed near the line, when the product is automatically flow into the station when the barrier is opened, the jig automatic clamping the pallet, manipulator vision automatic scanning screw is position, through mechanical hand vision system automatically calculated X Y value, the electric group of mobile manipulator to just above the screw, turn on the electric group manipulator Z axis moving down, when the mechanical hand to receive electric group of matter signal and to call second for screw......

          Responsibility description: responsible for the design of the main control circuit of the manipulator, writing program, selection of electrical components, debugging......

          Technical expertise

          Professional Title: mechanical and electrical integration

          Computer level: College non computer majors of grade three (soft)

          Computer skills: familiar with office components, commonly used familiar with some professional software: CAD, UG, SolidWorks, PLC programming software, touch screen programming softening, VB....

          Technical expertise: the main use of equipment: EPSON manipulator, Yaskawa manipulator, industrial vision, PLC, servo drive, Bu Jin drive, inverter, touch screen waiting......

          Language ability

          English: fluent in Cantonese: General

          English level:


        【電氣工程師個人英文簡歷】相關文章:

        電氣工程師英文簡歷06-24

        工程師的個人英文簡歷模板02-12

        技術工程師個人英文簡歷06-18

        工程師個人求職英文簡歷10-01

        電氣專業英文簡歷07-05

        電子工程師個人英文簡歷模板06-09

        技術工程師個人應聘英文簡歷08-27

        電器品質工程師個人英文簡歷07-23

        高級結構工程師個人英文簡歷08-03

        軟件工程師個人英文簡歷范文08-28

        国产高潮无套免费视频_久久九九兔免费精品6_99精品热6080YY久久_国产91久久久久久无码

        1. <tt id="5hhch"><source id="5hhch"></source></tt>
          1. <xmp id="5hhch"></xmp>

        2. <xmp id="5hhch"><rt id="5hhch"></rt></xmp>

          <rp id="5hhch"></rp>
              <dfn id="5hhch"></dfn>