Company's name: | SEPA environmental equipment LTDBegin and end date: 2005-09-2007-10 |
Enterprise nature: | Soly foreign funded enterprisesIndustry: Mechanics/Electrical Equipment/Heavy Industry |
Job Title: | Mechanical design |
Job description: | From September 2005, work for SEPA environmental equipment Ltd, undertake the design of Dyeing Sewage Treatment Plant project engineering in Science Park in Guangdong Xiqiao. Accomplish those work as followed : Primary Clarifier,Secondary Clarifier, polyester preparation equipment, mud fight unloading all the doors and steel design production facilities. And participate in the training organized by the Guangdong Provincial Environmental Protection Bureau which content is the sewage treatment organizations in technical training and the corresponding credentials. |
Reasons for leaving: | |
|
Company's name: | Xinyi Group (Humen) Glass Industrial ParkBegin and end date: 2004-03-2005-06 |
Enterprise nature: | Private enterprisesIndustry: Mechanics/Electrical Equipment/Heavy Industry |
Job Title: | Machine Design and Manufacture Engineer |
Job description: | Automobile stall after stall, side-windows, bus (glass) production line design automation four categories 13 specifications for stacking planes washing machine, GT furnace Hoist, glass rough conveyor. Pass the check debugging favoring. |
Reasons for leaving: | the mechanical design has been completed |
|
Company's name: | XinHui CIMC Co.,LtdBegin and end date: 2003-02-2004-01 |
Enterprise nature: | Sino-foreign joint venturesIndustry: Mechanics/Electrical Equipment/Heavy Industry |
Job Title: | New product development engineer |
Job description: | Makes to plan for the OFFICECONTAINER:The resources of the product role fixed position, product market fixed position, product construction series, product size series, product development installs, product development period, cost control, profits analysis, marketing mode and design a series of product- transact to gather to pack. still design moreover the NORFOLK fold box. |
Reasons for leaving: | |
|
Company's name: | CONGHUA Machine FactoryBegin and end date: 1993-07-2003-02 |
Enterprise nature: | Governmental agencyIndustry: Mechanics/Electrical Equipment/Heavy Industry |
Job Title: | Vice Director of a Factory |
Job description: | At CONGHUA Machine Factory, the success completes the main product in factory be transfered to fire fight product by farm machinery of turning and producing the technique works, managing the technique, quality check two sections, the development designs the MFMn96 preface the row wood the quality prevents fire a fist for, the GFMn96 preface row steel quality prevents fire the door,GFDMn96 guards against theft first door, among them the single a wood quality in MFM196 prevents fire door, through Szechwan DUJIANGYAN Nation Prevents Fire Building Materials Quantity Direct Examination the Test Center examines, creating at that time 90 minutes in tallest fire-proofextreme limit in product in of the same kind, becoming CONGHUA region product, the production that participate the product admits the application, design, manufacture on a trial basis, send the check and take the whole process that certificate, standard establish, the 1996 passes by to proceed to the business enterprise in a |
Reasons for leaving: | |
|
Company's name: | CONGHUA Ta Nb SmelteryBegin and end date: 1984-08-1993-07 |
Enterprise nature: | Governmental agencyIndustry: Petroleum/Chemical Industry/Minerals/Geology |
Job Title: | Equipments Engineer |
Job description: | Undertake primarily the business enterprise technique reforms not marking of the inside the design of the chemical engineering equipments works, than have the representative result have: 1,Ear 500 mixing blend the Na restores the system has the system, 2, the song stalk type leaves the heart ratings griddle;3, the circle mixing machine;4, the pure water system has the PVC yin and yang ion exchange system;5, resolve the slot; The independence completes the design to mark the equipments not more than 80 sets set totally;The part that complete the translation work ushers in the outside text in equipments data;The plait that establish the relevant regulation system writes the equipments management;The gearing of the standard equipments adjusts to try;And is given award to by upper grade supervisor section many times reward. Promote the engineer October in 1992. |
Reasons for leaving: | |